Workout Dates

Hi,
I have started the 12 week workout program.
All workouts for all weeks say “do by Thu”. Assume this means do by Thursday? Should these not be assigned specific dates?

I wonder if it is the same issue as reported on this thread

It does look like a bug. I haven’t done a training plan since last winter, but usually workouts left to do in the current week have “do by” with the date for the end of the week. Future weeks have “available at” and the date of the start of that week. Within the week you can do them in whatever order you want, they aren’t assigned on specific dates.