Game update v 1.104 [December 2025]

Hi everyone,
Phased rollout to macOS / Windows / Android devices starts today.
Phased rollout to tvOS / iOS starts tomorrow.

  • A new Progress Report screen is now available at the end of every cycling activity and shows career progress, fitness trends, and performance data. The new Progress Report replaces the previous Streaks screen, and includes all information previously featured in the Streaks screen.
    Progress-report-nov-2025-PR-racing-score

  • Six routes that were previously event-only are now available for free rides and meetups. Go get those badges!
    No Sleep Till Brooklyn (New York)
    Richmond Rollercoaster (Richmond)
    Innsbruck KOM After Party (Innsbruck)
    Yorkshire Double Loop (Yorkshire)
    Southern Coast Cruise (Watopia)
    Jarvis Seaside Sprint (Watopia)

  • Reduced the effort required to ride up the escalators in New York.

  • Improved the New York escalators to better balance the boost effect across riders of different weights.

  • Zwifters using Zwift Click v2 can now disable virtual shifting in Zwift Settings under the Hardware tab.

  • Fixed an issue that could potentially cause connection issues when pairing fitness devices using Wahoo Direct Connect (WiFi or Ethernet).

  • Fixed an issue that could cause a saved activity to have an incorrect name in some situations.

  • UPDATE: The long-awaited Draft Indicator is finally here! The new bar at the bottom of the HUD center keystone will show you when you are receiving a draft benefit, the longer the bar the greater the draft benefit - use the Draft Powerup to get max draft benefit! Details are on this thread.
    draft-indicator-nov-2025-PR

UPDATE December 17
Phased rollout continues to Windows / macOS / Android / iOS.
Phased rollout to iOS/tvOS begins today.

UPDATE December 19
Zwift game v1.104.3 is rolling out to macOS / Windows / Android first.
iOS / tvOS release will follow shortly, pending App Store review.

  • Fixed an issue where resistance may not work as expected for some trainers connected via Bluetooth or WiFi.
  • Android: Fixed an issue where JetBlack Victory trainers do not get discovered over Wi-Fi

Do you have questions or issues to report? Let us know below.


21 Likes