Earlier Calendar Release

Life on Zwift planning for training rides would be so much better if Zwift released the map calendar a few weeks earlier. I dont know about anyone else, but I set all of my training rides 3-4 weeks out. Having the calendar soon would he a great help.
What does anyone else think? Should Zwift release the calendar earlier?

It doesn’t really matter to me, in fact I don’t look at the calendar that often. I have set my training plan according to the required TSS and type of training. When i log into Zwift I look at the different world options and pic something interesting or somewhere I haven’t ridden in some time.

A lot of my riding is workouts so terrain does not matter that much. the only thing I don’t like during workouts is long downhill sections.

When i just ride or recover I pick what I feel like.